Overview

In September 2026, West Seattle Aerie #2643 completed a full roof recover of the 2,500‑sq‑ft middle flat roof above the banquet hall. This project addressed:

  • Active leaks
  • Ponding water
  • A failing scupper
  • Mixed membrane layers
  • Deteriorated flashing
  • HVAC curb issues

The new roof is a PVC 80‑mil membrane system installed by Frank’s Construction / San Juan Island Roofing Division.

Before Photos

Demolition

After Photos

Project Scope

The contractor completed:

  • Moisture survey and substrate preparation
  • Removal of wet/damaged insulation
  • Installation of PVC 80‑mil membrane
  • Tapered insulation for improved drainage
  • Scupper repair and enlargement
  • Full parapet flashing
  • HVAC curb remediation
  • Penetration sealing and capping
  • Cleanup, inspection, and warranty documentation

Why This Project Was Critical

The old roof was failing and causing:

  • Water intrusion
  • Damage to the banquet hall
  • Delays to the ADA bathroom project
  • Risk to the building structure

Completing this project protects the Aerie for decades to come.

Contractor Spotlight: Frank’s Construction

Frank Figueroa and his team at Frank’s Construction:

  • Professional workmanship
  • Careful moisture remediation
  • Code‑compliant installation
  • A 30‑year manufacturer warranty
  • A 20‑year workmanship warranty

We appreciate their work and dedication to getting this project done before the fall rains.

Support the Aerie

This project was essential — but expensive. If you’d like to support the Aerie’s roof fund:

  • Donate via Zelle: wse2643
  • Drop off donations at the club
  • Contact the Trustees for more information